Product Description:
Fast-foaming, temporary sealing, open-cell one component injection for instant water stop
Prior to injection, an investigation of the structure, the foundation soil or the construction pits and any leaks must be carried out according to the state of the art and the rules of technology and an injection concept must be planned. Packers must be set before injection. The areas to be injected must contain water. Dry structures require the preinjection of water. Trial injection is recommended.
Prior to injection, an investigation of the structure, the foundation soil or the construction pits and any leaks must be carried out according to the state of the art and the rules of technology and an injection concept must be planned. Packers must be set before injection. The areas to be injected must contain water. Dry structures require the preinjection of water. Trial injection is recommended.